MODULAR CONSTRUCTION
Our Mission
Modular construction is the future of mining infrastructure. As a discipline it’s roots are in projects where construction on site is impossible, but modular transportation is feasible. With today’s technology, the precision risk management required to make any project a maximum gage modular design is at our fingertips.
What is Maximum Gage?
-
Most projects use modular construction as a fallback option for construction tasks that are difficult or impossible to achieve on site. It is a bottom up approach to strategy that overlooks many opportunities to improve cost and schedule.
-
Maximum Gage is a top down approach that starts with the maximum possible module size at each logistics stage. The project baseline is defined using a Maximum Gage philosophy, giving the client more flexibility to optimize their project as it develops.

THINK BIGGER. BUILD BIGGER.
Why Modularize?
-
Active construction sites are dynamic risk management environments. The changes in risk assessment -- safety, quality, or budgetary – vary drastically from day to day.
-
Working off-site offers increasing degrees of environment control, from off site yards, to port staging areas, to fabrication shops, all the way to component factories.
-
Modularization seeks to study the logistics feasibility of pre-assembling structures and pre-installing components outside of the work front.
-
By identifying what can be done first, clients are given a full toolbox of strategies to pursue which allow them to minimize safety risks, minimize on-site manpower, improve quality, and improve schedule.

REDUCE RISK WITH MODULES
Why Virago?
-
We have decades of experience in turn key modular construction. Our services start with feasibility and don’t end until you or your client is running ore.
-
All of our services are backed by our world class Project Management, Fabrication Management, and Logistics Management systems.